CEMCON, Ltd. capitalizes on over 35 years of experience in the land development industry to provide wind developers with the experience needed to meet project deadlines and budgets.


Our professional team of engineers, surveyors and planners provide the land development experience required during the Feasibility, Due Diligence, Preliminary Site Design and Zoning, Engineering and Construction phases to ensure that design plans are accurate and complete, eliminating costly time delays, which is critical for a successful project.

FEASIBILITY

  • Assist with Site Selection
  • Wind Resource Assessment
    • Constraint Mapping
      • Property Setback/Zoning Restrictions
      • Wetland Mapping
      • FEMA Floodplain Mapping
      • Soil Mapping
    • Electric Transmission Line Study/Investigation
  • Conceptual Site Plan
  • Assist with turbine selection
  • Prepare Conceptual Opinion of Probable Cost
  • Assist with lease agreement
  • Compile information into Feasibility Report

DUE DILIGENCE

  • Management & Coordination of Site Assessment Services
    • Wind Monitoring
    • Soil Borings
    • Avian, wildlife & endangered species study
    • Wetland Survey
    • Drain tile Survey
    • Tree Survey (height & location)
    • Archeological Survey
    • Environmental Assessment
    • Aerial Topographic Survey
  • Due Diligence Report

PRELIMINARY SITE DESIGN & ZONING

  • Preliminary Site Plan
  • Zoning/Special Use Approval
  • Prepare Preliminary Engineer�s Opinion of Probable Construction Cost
  • Prepare Preliminary Development Report

ENGINEERING

  • Micrositing
    • Onsite constraint evaluation
    • Shadow Flicker Prevention Analysis
    • Noise Control
  • Land Surveying Services
    • Boundary/ALTA Survey
    • Site Access (Ingress/Egress Easements)
    • Utility Easements
    • Lease Agreement Legal Description Preparation
  • Civil Engineering Site Design
    • Supplemental Topographic Survey
    • Mass Earth Work/Grading
    • Access Road Design
    • Culvert/Bridge Design
    • Soil Erosion/Sediment Control Plan
    • Stormwater Pollution Prevention Plan
    • Existing Roadway & Intersection Improvement Plans
    • Traffic Flow Plan
    • Turbine Foundation Design
    • Plan & Profile Sheets
    • Detail Sheets
    • Prepare Engineer�s Opinion of Probable Construction Cost
  • Permitting
    • National Pollutant Discharge Elimination System (NPDES)
    • National Environmental Policy Act (NEPA)
    • Department of Natural Resources (DNR)
    • National Historic Preservation Act (HPA)
    • Federal Aviation Administration (FAA)
    • Army Corp of Engineers (ACOE)
    • US Fish & Wildlife Service (USFWS)
    • Endangered Species Consultation & Migratory Act
    • Roadway Use Permits & Agreements (State, county, township)
    • Building Permits

CONSTRUCTION

  • Construction Staking
    • Silt Fence
    • Mass Earth Work/Grading
    • Access Roads
    • Turbine Foundation Location
    • Site Utilities
    • Electric Transmission Lines
  • Construction Inspection Services
  • As-Built Boundary/ALTA Survey
    • Turbine Foundation Location
    • Access Roads
    • Permanent Structures